|
Visual inspection, noting hose arrangement and condition
of hoses and regulator housings. |
|
|
|
Intermediate and cracking pressures checked. |
|
|
|
Dismantle and clean all metal components in ultrasonic
cleaner. They are then washed in hot water to neutralise
the cleaning chemical, and dried and laid out for assembly
or replacement. |
|
|
|
All plastic and non metallic parts are thoroughly washed
and cleaned in warm water and a mild detergent. They are
then dried, and laid out for assembly or replacement. |
| |
|
|
All units are assembled with new “O” rings
and any other parts that need replacement, using in moderation,
the appropriate food grade silicon grease. |
| |
|
|
The intermediate and cracking pressures are set to the
manufacturer’s specification. |
|
|
|
A dry and a wet test are carried out, to ensure there
are no leaks. |
| |
|
|
The unit is then pressurised for a time, and is monitored
to ensure that there is no IP creep. |
|
|
|
Finally, the regulator is tested in our on site pool. |
|
|
|
The service is now completed and guaranteed - the regulator
is returned to the customer. |